Guided route
The next step is clear.
SiteNorthline DallasAdded load4 L2 chargerskW range68-92 kWMissing filemain-service photoOwnerelectricianNext steptake photo
Ampscale prepares the file. Reviewers still decide.
A short example from the Northline demo: site summary, added load, file grade, and next step.
Ampscale prepares the file. Reviewers still decide.
Ampscale prepares the file. Reviewers still decide.
Utility interval row
May demand bill
Installer scope
Service label transcript
| Reviewer comment | Missing file | Send | Owner | File update | Status |
|---|---|---|---|---|---|
| Existing load basis unclear | 12 months demand history | utility interval data or bills | account holder | attach load basis summary | open |
| Service rating not visible | main-service photo | switchgear / main label photo | electrician | update service facts | open |
| Proposed EVSE load missing | charger cut sheet | manufacturer cut sheet | installer | update load scenario | ready |
| Panel schedule missing | panel schedule | field photo or schedule PDF | facilities | attach panel detail | open |