Ampscale
Warehouse loading area with trucks and industrial electrical needs
Warehouse power readiness

Which warehouse can move first?

Rank sites by headroom, missing proof, and permit path before chargers, automation, refrigeration, or tenant equipment gets delayed.

Sites ranked fast
Missing evidence clear
Upgrade risk visible
Headroom range
Missing proof
Permit path
Plain answer

Which building has enough power for the next project?

Ampscale turns scattered bills, drawings, photos, and plans into a simple ready / needs proof / upgrade-risk view for each site.

EV chargingAutomationTenant loadReefer docks
Warehouses and 3PLHeadroom Passport
Which building has enough power for the next project?
Sample pathAdd with evidence
ConfidenceMedium
  • Bill or interval data checked
  • Photos or drawings improve confidence
  • Permit path and next owner shown
Evidence ladder

Start with what you have.

Each added proof point tightens the range and makes the package easier to review.

Portfolio bills

Create a quick screen even when each site has different utility records.

Site photos and drawings

Find mismatches between the panel, old one-line, and current operation.

Project scenarios

Compare chargers, conveyors, HVAC, freezer, and tenant equipment side by side.

Decision paths

Know the next move before money is stuck.

Path 1

Best first site

Pick the building with the strongest evidence and fastest approval path.

Path 2

Lowest-cost proof

Show the least work needed to raise confidence enough for review.

Path 3

Capex risk

Flag where utility review or service upgrade risk can change the budget.